The 6 AT&T Parking Garage was started on May 7, 2010, with awarding general contractor HC Beck. Running the project is HC Becks project manager, Kevin Newton and Superintendent Ronnie Salas along side Marek's Miguel Servin, Moises Sanchez Jr. and Tommy Weeks. The three story parking garage with 4" heavy gauge exterior framing and dens-glass behind Engineered stone panels and Aluminum panels. The interior 1 1/2" "Z" furring with rigid insulation and drywall on CMU walls. Plus 2X4 second-look tegular ceiling tile at lobby & restrooms.