commercial
Virtual Construction Services with BIM
Exterior Framing – We have the capability to break the exterior walls into different layers. Our design can reveal framing, sheathing, and other layers which can be added in an exterior wall along with attachment clips as required.
Class Time!
[[{"fid":"362","view_mode":"default","fields":{"format":"default","field_locations[und]":"2","field_file_image_alt_text[und][0][value]":"","field_file_image_title_text[und][0][value]":"Economics Class with instructor Ted Hajdik","field_image_tags[und]":""},"type":"media","attributes":{}}]]
Pictured above is one of our Economics classes with instructor Ted Hajdik
VA clinic completed
The VA clinic is completed, and recently opened in south east Austin. We'd like to thank all of our employees for their hard work as well as foreman Doug Prew!
[[{"fid":"360","view_mode":"default","fields":{"format":"default","field_locations[und]":"2","field_file_image_alt_text[und][0][value]":"","field_file_image_title_text[und][0][value]":"","field_image_tags[und]":""},"type":"media","attributes":{}}]]
The Craftsmen in our Workforce Development Project completed a very special project last week
Excellence in Construction Awards
- University of Texas Welch Hall 1929 East Wing renovation – Foreman Theo Moser, Chase McNeil, Project Manager
- Veterans Administration Met Center Building 5 Phase 2 – Foreman Juan “Kally Man” Mendoza, Jay D.
Marek Service Awards Dinner
Recruiting High Schools
[[{"fid":"388","view_mode":"default","fields":{"format":"default","field_locations[und]":"2","field_file_image_alt_text[und][0][value]":"","field_file_image_title_text[und][0][value]":"High school recruiting","field_image_tags[und]":""},"type":"media","attributes":{}}]]